Constructing the Cambridgeshire Guided Busway bridge to Addenbrooke's Hospital
Constructing the Cambridgeshire Guided Busway bridge over the railway to Addenbrooke's Hospital. The bridge embankments and supporting structures were constructed in September-October 2007. On 20 October 2007, a heavy-lift crane was used to move seven beams into place. This photograph shows beam 5 being moved towards the bridge structure, from the east side of the railway line. Photo: Andrew Roberts, October 2007.
Transport page
Copyright © 2007, Trumpington Residents’ Association. Updated 24 October 2007.