Trumpington Residents' Association
Trumpington Village Sign unveiled June 2010, designed by Sheila Betts.
Photo gallery: Cambridgeshire Guided Busway through Trumpington
Trumpington Park & Ride to Shelford Road Long Road area
Shelford Road to Long Road Addenbrooke's Hospital spur and bridge
A: Pedestrian and cycle tunnel under Long Road
A temporary cut in the embankment on Long Road
Concrete structures waiting to be installed under Long Road
The temporary cut in the embankment on Long Road, while the new access tunnel was being constructed. Photo: Andrew Roberts, August 2007
Concrete structures waiting to be installed to create the new access tunnel under Long Road. Photo: Andrew Roberts, August 2007
A temporary cut in the embankment on Long Road
Starting to infill the cut
The temporary cut in the embankment, with the first concrete structures in place. Photo: Stephen Brown, August 2007
Starting to infill the cut. Photo: Stephen Brown, August 2007
The temporary footpath and cycle track along Long Road No traffic congestion, for a change!
The temporary footpath and cycle track along Long Road. Photo: Stephen Brown, August 2007
No traffic congestion on Long Road, for a change!. Photo: Stephen Brown, August 2007
Concrete structures being moved into place
Pumping concrete into the bridge structure
The concrete structures being moved into place. Photo: Andrew Roberts, August 2007
Pumping concrete into the tunnel structure. Photo: Stephen Brown, August 2007
Cyclists crossing the completed access tunnel
The old railway bridge under Long Road
The old railway bridge under Long Road, to the east of the new tunnel, to be used by the Guided Busway. Photo: Andrew Roberts, September 2007
Cyclists crossing the completed access tunnel. Photo: Andrew Roberts, September 2007
B: Constructing the busway track north and south of Long Road
The line of the old railway, looking south from Long Road, before work starts on the Guided Busway, July 2007.
The line of the old railway, looking south from Long Road, before work starts on the Guided Busway. Photo: Andrew Roberts, July 2007
Construction work on the Cambridgeshire Guided Busway, looking south from Long Road towards the railway station, 25 May 2009.
Construction work on the Cambridgeshire Guided Busway, looking north from Long Road towards the railway station, 25 May 2009.
Construction work on the Cambridgeshire Guided Busway, looking south and north from Long Road. Photo: Andrew Roberts, May 2009.
Laying foundations for the Cambridgeshire Guided Busway, south of Long Road, 14 June 2009.
Laying foundations for the Cambridgeshire Guided Busway, looking north towards Hills Road, 14 June 2009.
Laying foundations for the Cambridgeshire Guided Busway, looking south and north from Long Road. Photo: Andrew Roberts, June 2009.
Laying the guided busway track, south of Long Road, 28 July 2009.
Laying the guided busway track, south of Long Road, 28 July 2009.
Laying the guided busway track, south of Long Road. Photo: Andrew Roberts, July 2009.
Laying the guided busway track, south of Long Road, 28 July 2009.
Laying the guided busway track, south of Long Road. Photo: Andrew Roberts, July 2009.
Laying the guided busway track, south of Long Road, 28 July 2009.
Laying the guided busway track, south of Long Road, 28 July 2009.
Laying the guided busway track, close to the old railway bridge, north of Long Road, 30 July 2009.
Laying the guided busway track, close to the old railway bridge, south and north of Long Road. Photo: Andrew Roberts, July 2009.
The new guided busway track south of Long Road, 8 August 2009.
The new guided busway track north of Long Road, 8 August 2009.
The new guided busway track, south and north of Long Road.. Photo: Andrew Roberts, August 2009.
Cambridgeshire Guided Busway gallery page
Copyright © 2009, Trumpington Residents’ Association. Updated 28 October 2009.
Trumpington Residents’ Association. A Company Limited by Guarantee. Company Number 6729377. Registered in England. Registered Office: Trumpington Pavilion, Paget Road, Trumpington, Cambridge CB2 9JF.